The Content Farm
Home » Channels » How Farms Work »

Proposed 200-MW Solar Facility | NextEra Energy

11.43pm - Friday 10th January 2020 46,540

We take a ride in the truck down the middle of the proposed 200-MW Grant County Solar Energy Center by NextEra Energy along Highway 61 in Potosi, Wisconsin. The proposed facility is just north of the main farm in Rockville, and is on two sides of the farm. If constructed, it will be the second largest solar facility in the state of Wisconsin.

Subscribe to How Farms Work ► http://bit.ly/XYVvDd
How Farms Work Store ► https://www.HowFarmsWork.com/store.html
Facebook ► http://on.fb.me/YpS8oH
Follow us on Snapchat: ► https://www.snapchat.com/add/HowFarmsWork

Become a Member! ➤ https://www.youtube.com/channel/UCfECR0XVFoy3DunTSQC-E-g/join

Business Inquiries: howfarmswork@gmail.com

*Winter Schedule*
Our schedule may vary, but expect a new video every Wednesday and Saturday at 11AM Central!

How Farms Work by Ryan Kuster is a YouTube channel based in rural Potosi, Wisconsin.

Our mission is to teach those who didn't grow up on a farm what the farming life is like.
These videos show the Kuster family working together raising cattle and crops. We believe everyone who wants to know more about farming should be able to share the farming experience with us and we look to educate the world on many essential agriculture topics.

How Farms Work takes place on ~1,100 acres with around 75-200 cattle at any given time. Four John Deere tractors are currently used on the farm, which are a 4020, 4640, 7600, and 8235R.

More Videos